Art FrickeHome Renovation & Repair Specialist
Expert Interview. 1 July 2020.
The following steps will allow you to prepare a concrete floor before you lay your tiles.
Clean the Floor
Sweep the floor for dust and debris. Use a broom to sweep any debris from the floor.
Remove dust. Use a wet mop to get any remaining dust from the cement floor. Leveling compounds are sensitive to dust so it's important to remove the dust with water. Allow the floor to dry for at least 1 hour.
Level the Floor
Use a level to check the floor. Use a large carpenter's level to identify low areas of the floor. Move the level across the floor and use a marker to mark low levels of the concrete.
Apply self-leveling compound. Mix the self-leveling compound in a bucket according to package directions. Pour the compound into a bucket. Slowly pour the compound into the areas that you previously marked as low. The compound will expand and rise to reach the correct levels of the rest of the concrete. Use a trowel to spread the compound until it is as flat and smooth as possible. Allow the compound to dry for 24 hours before starting on your tile.